Buena Vista Pumping Station
A new cast-in-place concrete pumping station and stormwater retention pond with three 250 HP vertical turbine pumps, distribution and controls.
Project Details
- Owner
- U.S. Army Corps of Engineers, Mobile District
- Role
- Prime Contractor
- Contract Value
- $3,345,422.00
- Status
- Completed · awarded FY 1998
- Job #
- 9802
Project Overview
Overstreet constructed a new stormwater retention pond — including more than 150,000 cubic yards of excavation — and a new poured-in-place concrete pumping station.
Scope Highlights
- Excavation, formwork, reinforcing steel and concrete for vertical turbine pumps
- Three (3) new 250 HP vertical turbine pumps
- Structural steel, miscellaneous metals, asphalt road and parking lot
- New electrical distribution system, feeders and pumping-station controls
Legacy project performed by the predecessor firm, Overstreet Electric Co., Inc.
More work like this
Advanced Wastewater Treatment Facility
Electrical distribution, MCCs, I&C and standby generation for a major expansion of the city's wastewater treatment facility.
Feeder 5 Electrical Upgrades
Design-build modification of the existing 13.2 kV overhead distribution system on Fort Sill, improving the reliability and safety of the installation's electrical network.
Controls, Electronics & Integration Laboratory
The complete electrical scope for a new high-tech electronics laboratory — from 15 kV site distribution to fiber, fire alarm and mass notification.