13.8 kV Substation Upgrade, Jim Woodruff Powerhouse
Substation modernization at a hydroelectric powerhouse — SF6 switches, 115 kV circuit switchers, armor-clad turbine feeders and a new underground utility tunnel.
Project Details
- Owner
- U.S. Army Corps of Engineers, Mobile District
- Role
- Prime Contractor
- Contract Value
- $2,701,000.00
- Status
- Completed · awarded FY 1998
- Job #
- 9804
Project Overview
Overstreet provided all labor, materials and equipment to modernize the 13.8 kV substation at the Jim Woodruff Powerhouse.
Scope Highlights
- Replaced existing oil switches with new SF6 switches; replaced disconnect switches
- 115 kV circuit switchers, bussing and ground grid
- New 15 kV armor-clad feeders to the existing turbines
- New concrete foundations and fire walls for power transformers; new ventilation building
- New 100-ft-long, 12-ft-wide × 10-ft-high poured-in-place concrete utility tunnel, 20 ft deep, with sheet piling
- Modified the control switchboard and replaced all control and relay wiring
- Overcurrent relays, cable tray and vacuum circuit breakers for existing switchgear
Legacy project performed by the predecessor firm, Overstreet Electric Co., Inc.
More work like this
John Kerr Powerhouse Substation Upgrade
Major substation upgrade and replacement with 26 new SF6 circuit breakers, new bussing, structure and grounding counterpoise.
Replace Power Transformer, Substation T-44
Replaced the existing power transformer with a new 100 MVA unit and completed the project five weeks after transformer delivery.
Feeder 5 Electrical Upgrades
Design-build modification of the existing 13.2 kV overhead distribution system on Fort Sill, improving the reliability and safety of the installation's electrical network.