Replace Power Transformer, Substation T-44
Replaced the existing power transformer with a new 100 MVA unit and completed the project five weeks after transformer delivery.
Project Details
- Owner
- NASA
- Role
- Prime Contractor
- Contract Value
- $1,315,000.00
- Status
- Completed · awarded FY 2001
- Job #
- 201
Project Overview
Overstreet removed and replaced the existing power transformer at Substation T-44 with a new 100 MVA power transformer.
Scope Highlights
- New 100 MVA power transformer
- Constructed new concrete foundations and modified existing foundations
Outcomes
- Completed five weeks after delivery of the new power transformer
- Delivered ahead of schedule
Legacy project performed by the predecessor firm, Overstreet Electric Co., Inc.
More work like this
John Kerr Powerhouse Substation Upgrade
Major substation upgrade and replacement with 26 new SF6 circuit breakers, new bussing, structure and grounding counterpoise.
13.8 kV Substation Upgrade, Jim Woodruff Powerhouse
Substation modernization at a hydroelectric powerhouse — SF6 switches, 115 kV circuit switchers, armor-clad turbine feeders and a new underground utility tunnel.
Feeder 5 Electrical Upgrades
Design-build modification of the existing 13.2 kV overhead distribution system on Fort Sill, improving the reliability and safety of the installation's electrical network.