John Kerr Powerhouse Substation Upgrade
Major substation upgrade and replacement with 26 new SF6 circuit breakers, new bussing, structure and grounding counterpoise.
Project Details
- Owner
- U.S. Army Corps of Engineers, Savannah District
- Role
- Prime Contractor
- Contract Value
- $2,903,659.00
- Status
- Completed · awarded FY 2002–2003
- Job #
- 302
Project Overview
A major substation upgrade and replacement at the John Kerr Powerhouse, including demolition and disposal of the existing oil-filled substation equipment.
Scope Highlights
- Provided and installed 26 new SF6 circuit breakers
- New bussing, structural steel and grounding counterpoise
- New concrete foundations and pads
- Demolition and disposal of existing oil-filled breakers, bus, structure and foundations
Legacy project performed by the predecessor firm, Overstreet Electric Co., Inc.
More work like this
13.8 kV Substation Upgrade, Jim Woodruff Powerhouse
Substation modernization at a hydroelectric powerhouse — SF6 switches, 115 kV circuit switchers, armor-clad turbine feeders and a new underground utility tunnel.
Replace Power Transformer, Substation T-44
Replaced the existing power transformer with a new 100 MVA unit and completed the project five weeks after transformer delivery.
Feeder 5 Electrical Upgrades
Design-build modification of the existing 13.2 kV overhead distribution system on Fort Sill, improving the reliability and safety of the installation's electrical network.