CAGE 11M40 · UEI TRA6Q4B9K4D8 (404) 884-4159jay@overstreetec.com
Home/Projects/Electrical Upgrades, Area B
Wright-Patterson AFB, Ohio

Electrical Upgrades, Area B

Replaced a loop-fed 6.9 kV distribution system with a new 15 kV system and installed a new 100 MVA power transformer — across 60+ buildings.

Project Details

Owner
U.S. Army Corps of Engineers, Louisville District
Role
Prime Contractor
Contract Value
$3,916,000.00
Status
Completed · awarded FY 1996
Job #
596

Project Overview

Overstreet replaced the existing loop-fed 6.9 kV distribution system with a new 15 kV distribution system and installed a new 100 MVA power transformer in the existing substation.

The work required a complex construction sequence using new and existing pad-mounted switches to replace medium-voltage cabling in stages, re-tapping existing transformers during numerous scheduled outages in sequential order.

Scope Highlights

  • New 15 kV cable, duct banks, street crossings, concrete and asphalt saw cutting, demolition and patching
  • Pre-cast manholes, cable racking, insulators, cable fireproofing and grounding counterpoise
  • Concrete-encased duct banks, terminations, load-break and dead-break elbows
  • Re-tapped existing pad-mounted and unit substation transformers
  • Replaced switchboards, panelboards and dry-type transformers in more than 60 buildings

Outcomes

  • Delivered across 60 buildings without service interruption

Legacy project performed by the predecessor firm, Overstreet Electric Co., Inc.

Have a mission-critical project?
Let's talk.

Start a Conversation → (404) 884-4159