Feeder 5 Electrical Upgrades (representative image)In Progress
Fort Sill, Oklahoma

Feeder 5 Electrical Upgrades

Design-build modification of the existing 13.2 kV overhead distribution system on Fort Sill, improving the reliability and safety of the installation's electrical network.

U.S. Army Corps of Engineers$1,289,206
Controls, Electronics & Integration Laboratory (representative image)In Progress
Redstone Arsenal, Alabama

Controls, Electronics & Integration Laboratory

The complete electrical scope for a new high-tech electronics laboratory — from 15 kV site distribution to fiber, fire alarm and mass notification.

U.S. Army Corps of Engineers$993,000
Hangar 125, SW Annex (representative image)In Progress
Robins AFB, Georgia

Hangar 125, SW Annex

Entire electrical scope for the complete three-story, 15,000 SF remodel of a historic landmark hangar originally constructed in 1942.

U.S. Army Corps of Engineers$1,092,000
Replace Transformer SS-849 & Panel CP (representative image)In Progress
Kennedy Space Center, Florida

Replace Transformer SS-849 & Panel CP

Fast-track replacement of a unit substation with stainless-steel equipment, executed within a single 8-hour scheduled outage.

NASA$408,000
National Accelerator Laboratory 15 kV Cable Installation (representative image)In Progress
Fermilab, Batavia, Illinois

National Accelerator Laboratory 15 kV Cable Installation

Installation of 41,000 LF of government-furnished 750 MCM 15 kV shielded cable with 84 underground splices and terminations.

U.S. Department of Energy$317,000
Electrical Upgrades, Area B (representative image)Completed
Wright-Patterson AFB, Ohio

Electrical Upgrades, Area B

Replaced a loop-fed 6.9 kV distribution system with a new 15 kV system and installed a new 100 MVA power transformer — across 60+ buildings.

U.S. Army Corps of Engineers$3,916,000
Modifications to Electrical Distribution System (representative image)Completed
Fort Knox, Kentucky

Modifications to Electrical Distribution System

New Central Energy Plant for the Fort Knox hospital with two 2.5 MW 15 kV generators, paralleling switchgear and five miles of rebuilt overhead distribution.

U.S. Army Corps of Engineers$3,531,536
Buena Vista Pumping Station (representative image)Completed
Muscle Shoals, Alabama

Buena Vista Pumping Station

A new cast-in-place concrete pumping station and stormwater retention pond with three 250 HP vertical turbine pumps, distribution and controls.

U.S. Army Corps of Engineers$3,345,422
John Kerr Powerhouse Substation Upgrade (representative image)Completed
Boydton, Virginia

John Kerr Powerhouse Substation Upgrade

Major substation upgrade and replacement with 26 new SF6 circuit breakers, new bussing, structure and grounding counterpoise.

U.S. Army Corps of Engineers$2,903,659
13.8 kV Substation Upgrade, Jim Woodruff Powerhouse (representative image)Completed
Chattahoochee, Florida

13.8 kV Substation Upgrade, Jim Woodruff Powerhouse

Substation modernization at a hydroelectric powerhouse — SF6 switches, 115 kV circuit switchers, armor-clad turbine feeders and a new underground utility tunnel.

U.S. Army Corps of Engineers$2,701,000
Advanced Wastewater Treatment Facility (representative image)Completed
Panama City Beach, Florida

Advanced Wastewater Treatment Facility

Electrical distribution, MCCs, I&C and standby generation for a major expansion of the city's wastewater treatment facility.

City of Panama City Beach$1,858,000
Airfield Lighting Upgrade (representative image)Completed
Tyndall AFB, Florida

Airfield Lighting Upgrade

Replaced runway, taxiway and threshold lighting and installed a new computer-controlled airfield lighting control panel.

U.S. Army Corps of Engineers$1,766,257
Technology Retrofit (Fiber & LAN) & General Construction (representative image)Completed
Fort Knox, Kentucky

Technology Retrofit (Fiber & LAN) & General Construction

Design-build campus network: new fiber optic outside plant, fiber switches and over 900,000 LF of Category 5 cable for an existing school campus.

U.S. Army Corps of Engineers$1,338,639
Replace Power Transformer, Substation T-44 (representative image)Completed
Moffett Field, California

Replace Power Transformer, Substation T-44

Replaced the existing power transformer with a new 100 MVA unit and completed the project five weeks after transformer delivery.

NASA$1,315,000
Electrical Utilities & Site Repairs, USDA Research Facility (representative image)Completed
New Orleans, Louisiana

Electrical Utilities & Site Repairs, USDA Research Facility

Replaced 15 kV air-insulated walk-in switchgear with new vacuum-breaker switchgear, plus new feeders, switchboards and 12,000 SY of paving.

U.S. Department of Agriculture$929,434
Peak Shaving Generators (representative image)Completed
Camp Lejeune, North Carolina

Peak Shaving Generators

Furnished and installed a 1,500 kW 15 kV enclosed diesel generator with peak-shaving switchgear.

Department of the Navy$835,934

Projects dated before 2024 were performed by the predecessor firm, Overstreet Electric Co., Inc. Photography shown is representative of the type of work, not the specific site, unless labeled otherwise.

Past Performance

Completed contract history, FY 1995–2003

The full itemized record of completed contracts from Overstreet Electric Co., Inc. — 86 contracts, 73 as prime, for federal, military and municipal owners.

ProjectFYJob #TypeOwnerAmount
ARSR-Radar Facility, Tyndall AFB, Panama City, FLFY 1995195SubFAA$174,017.00
Power to Bunker 87, Coastal Systems Station, Panama City, FLFY 1995295PrimeDept. of the Navy$18,368.00
Revitalize Family Housing, Electrical Sitework, Fort Campbell, KYFY 1995395SubCorps of Engineers$1,106,146.15
Replace Main Switchgear, Substation No. 9, Holston Army Ammo Plant, TNFY 1995495PrimeCorps of Engineers$622,467.00
Lighting Repairs, Coastal Systems Station, Panama City, FLFY 1995595PrimeDept. of the Navy$9,755.00
Recloser Repairs at the Coastal Systems Station, Panama City, FLFY 1995695PrimeDept. of the Navy$48,323.00
Replace Generator & Transformer, NAS Atlanta, GAFY 1995795SubDept. of the Navy$74,900.00
Rehab Interior Electrical System, Milan Army Ammo Plant, Milan, TNFY 1995895PrimeCorps of Engineers$1,182,000.00
Replace 15kV Breakers at 29th St. Substation, Fort Campbell, KYFY 1995995PrimeDept. of the Army$120,797.23
Replace Electric Substation, Maxwell AFB, ALFY 19951095PrimeAir Force$743,681.00
Install Parking Lot & Security Lights, Fort Campbell, KYFY 19951195PrimeDept. of the Army$299,551.24
Taxiway F & Parallel Lighting, Hurlburt Field, FLFY 19951295SubAir Force$196,000.00
Instrumentation & Controls Project, Bay County WTP, Panama City, FLFY 19951395SubBay County$158,985.00
Electric Utilities & Site Repairs, USDA Research Center, New Orleans, LAFY 1996196PrimeUSDA$929,434.00
Computer Technology Retrofit, Pensacola High School, Pensacola, FLFY 1996296PrimeSchool Board$331,457.00
Replace Airfield Signs, Hurlburt Field, FLFY 1996396PrimeAir Force$44,764.00
Modifications to Electrical Distribution System, Fort Knox, KYFY 1996496PrimeCorps of Engineers$3,531,536.00
Electrical Upgrades, Area B, Wright-Patterson AFB, Dayton, OHFY 1996596PrimeCorps of Engineers$3,916,000.00
Replace Pad Mounted Transformers & Unit Substations, NSA Millington, TNFY 1996696PrimeDept. of the Navy$263,138.00
Parking Lot Lighting, Ferry Pass Plaza, Pensacola, FLFY 1996796PrimeAmren Corp.$99,871.00
Taxiway Lights & Signs, Eglin AFB, FLFY 1996896PrimeAir Force$333,861.10
Peak Shaving Generators, Camp Lejeune, NCFY 1996996PrimeDept. of the Navy$835,934.00
Bayou Marcus Water Reclamation Facility, Pensacola, FLFY 19961096SubEscambia County$554,000.00
Soccer Field Lighting, NAS Whiting Field, Milton, FLFY 19961196PrimeDept. of the Navy$167,626.00
SCADA System Upgrade, NAS Pensacola, FLFY 19979701PrimeDept. of the Navy$217,132.28
Replace Main Switchgear, United States Postal Service JAX, Jacksonville, FLFY 19979702PrimeU.S. Postal Service$237,518.56
Repair Substation #3, NAS JAX, Jacksonville, FLFY 19979703PrimeDept. of the Navy$947,013.00
Millville Wastewater Treatment Plant Upgrade, Panama City, FLFY 19979704SubBay County$1,180,753.00
Replace 15kV Circuits, Wright-Patterson AFB, Dayton, OHFY 19979705PrimeAir Force$549,183.00
Underground Electrical Distribution Sys., Coastal Systems Station, Panama City, FLFY 19979706PrimeDept. of the Navy$326,000.00
Improvements to Water Treatment Plant, Fort Campbell, KYFY 19979707PrimeDept. of the Army$471,000.00
Replace Deluge Pumps, Fort Campbell, KYFY 19979708PrimeDept. of the Army$431,947.00
Replace Power Regulators, Eglin AFB, FLFY 19979709PrimeAir Force$127,694.00
Jogging Trail Lighting, CSS, Panama City, FLFY 19979710PrimeDept. of the Navy$94,640.00
Upgrade Ballfield Lighting, Pace Athletic Fields, Pace, FLFY 19989801PrimeCity of Pace$24,683.00
Buena Vista Pump Station, Muscle Shoals, ALFY 19989802PrimeCorps of Engineers$3,345,422.00
High Service Pump Facility, Bay County, Panama City, FLFY 19989803SubBay County$571,165.58
13.8kV Substation Upgrade, Jim Woodruff Powerhouse, Chattahoochee, FLFY 19989804PrimeCorps of Engineers$2,701,000.00
Install Emergency Generator, J.E. Hall Center, Pensacola, FLFY 19989805PrimeSchool Board$57,588.00
Repair Primary Electrical Service, Hangar 101, NAS Jacksonville, FLFY 19989806PrimeDept. of the Navy$709,949.00
Install Rotating Beacon, NAS Whiting Field, Milton, FLFY 19989807PrimeDept. of the Navy$134,500.00
Replace Overhead Primary Service, US Coast Guard, Mobile, ALFY 19999901PrimeU.S. Coast Guard$500,797.00
Frank Brown Athletic Park, Panama City Beach, FLFY 19999902SubP.C. Beach, FL$697,000.00
Lake Tholloco Dam Repairs, ALFY 19999903PrimeCorps of Engineers$223,691.00
Ammunition Containerization Project, Anniston Depot, Anniston, ALFY 19999904PrimeCorps of Engineers$3,538,414.00
Install 12.47 kV Feeder to Naval Dive Training Center, CSS, Panama City, FLFY 19999905PrimeDept. of the Navy$84,363.00
Poseidon Wharf Repairs, Cape Canaveral, FLFY 19999906PrimeDept. of the Navy$1,086,500.00
Storm Drainage & Sitework Repairs, Fort Stewart, GAFY 19999907PrimeCorps of Engineers$338,464.00
Technology (CAT 5 & Fiber LAN) & General Construction, Fort Knox, KYFY 19999908PrimeCorps of Engineers$1,338,639.00
Local Area Network (U.G. & Aerial Fiber Optic Network), Laurel Bay, SCFY 19999909PrimeCorps of Engineers$246,026.00
Wide Area Network (U.G. Fiber Optic Network), Fort Rucker, ALFY 19999910PrimeCorps of Engineers$55,917.00
Wide Area Network (U.G. & Aerial Fiber Optic Network), Fort Stewart, GAFY 19999911PrimeCorps of Engineers$110,999.00
Wide Area Network (U.G. & Interior Fiber Optic Network), Fort Jackson, SCFY 19999912PrimeCorps of Engineers$119,000.00
Tiger Point Sports Complex, Outdoor Lighting, Gulf Breeze, FLFY 19999913PrimeSanta Rosa Co.$363,000.00
Outdoor Lighting Facility, Coastal Systems Station, Panama City, FLFY 2000100PrimeDept. of the Navy$21,300.00
Electrical Upgrades, Williams Bayou Pump, Panama City, FLFY 2000200PrimeBay County$258,810.00
Replace H.V. Electrical Equipment, Langley Research Center, VAFY 2000300PrimeNASA$477,946.00
Computer Technology Retrofit, Bluewater Bay School, FLFY 2000400PrimeOkaloosa Co., FL$52,280.00
Advanced Wastewater Treatment Facility, Panama City, FLFY 2000500SubP.C. Beach$1,858,000.00
Electrical Modifications, Escambia Co. Schools, Pensacola, FLFY 2000600PrimeEscambia Co.$144,711.00
Dike Construction & Weir Replacement, Area 12B, Savannah Harbor, GAFY 2000700PrimeCorps of Engineers$2,732,345.95
Ammunition Transfer Facility, Anniston Army Depot, ALFY 2000800PrimeCorps of Engineers$1,733,692.00
Electrical Distribution Upgrade, NAS Fort Worth, TXFY 2000900PrimeDept. of the Navy$245,398.12
Airfield Lighting Upgrade, Tyndall AFB, Panama City, FLFY 20001100SubCorps of Engineers$1,766,257.40
Area 4 Dike Repairs, Sunny Point, NCFY 20001200PrimeCorps of Engineers$3,085,732.00
Replace G&W Switches, Cherry Point, NCFY 20001300PrimeDept. of the Navy$356,207.00
Upgrade 5th Ave Pump Station, Little Calumet River, INFY 2001101PrimeCorps of Engineers$2,387,500.00
Replace Transformer T-44, Moffett Field, CAFY 2001201PrimeNASA$1,315,000.00
Electrical Repairs, Bldg 1414, NAS Fort Worth, TXFY 2001301PrimeDept. of the Navy$176,870.46
Electrical Distribution, Phase 3, Guantanamo Bay, CubaFY 2001401PrimeDept. of the Navy$3,853,560.00
Whitney Power Plant Upgrade, Laguna, TXFY 2001501PrimeCorps of Engineers$667,600.00
Electrical Dist., White Sands Test Facility, NMFY 2001601PrimeNASA$929,000.00
Replace Generators, VAMC, Louisville, KYFY 2001701PrimeDept. of VA$209,000.00
Concrete Box Culvert, Helena, ARFY 2001801PrimeCorps of Engineers$4,250,261.40
Disposal Area 12A, Savannah, GAFY 2001901PrimeCorps of Engineers$4,306,035.86
Powerhouse Generation Debris/Recovery Gate, Millers Ferry Dam, ALFY 20011001PrimeCorps of Engineers$4,505,715.92
Replace 480V Substation No. 5B, Naval Submarine Base, Bremerton, WAFY 20011101PrimeDept. of the Navy$2,852,587.00
Electrical Distribution System, Phase 3, Guantanamo Bay, CubaFY 20011201PrimeDept. of the Navy$1,297,716.00
John Kerr Powerhouse Substation Upgrade, Boydton, VAFY 2002 & 2003302PrimeCorps of Engineers$2,903,659.00
Install Station Transformer, Chief Joseph Dam PowerhouseFY 2002 & 2003402PrimeCorps of Engineers$1,129,000.00
Substation No. 2, Hill AFB, UTFY 2002 & 2003502PrimeDept. of Air Force$974,700.00
Replace Transformers, JW Powell Bldg., Washington, D.C.FY 2002 & 2003602PrimeGSA$1,323,374.00
Construct Wind Turbine Farm and Upgrade O.H. Primary Distribution, Guantanamo Bay, CubaFY 2002 & 2003103SubDept. of the Navy$421,000.00
Flagpole Lighting, Guantanamo Bay, CubaFY 2002 & 2003104SubDept. of the Navy$3,000.00
Reconductor and Re-insulate Existing O.H. Primary, Guantanamo Bay, CubaFY 2002 & 2003204PrimeDept. of the Navy$1,167,750.00
Protective Relaying Upgrade & Flagpole Lighting, Guantanamo Bay, CubaFY 2002 & 2003504PrimeDept. of the Navy$34,733.00